Renzo Piano is great but the roofless theatre is unacceptable.
|
The same space can be used in a better way by Trevisan's project that costs less. Trevisan's project is not a rehash of the 1866 Barry design but will provide: a `memory` lane (a memory of the past, the war etc) and an all purpose hall. |
A solution provided by Arch Giovanni Trevisan
RICOSTUIRE L'ANTICO IN LEGGEREZZA.

A Flexible-Infrastructure, partially dressed in stone/ marble.

This building could entertain hi-tech shows, musicals, conferences, Opera etc.


"This could make this one of
the most spectacular and successful public centres in Europe,
rivaling New York’s Lincoln Centre and London’s South Bank,
with the added benefit of being in the very heart of Valetta".Sir
Cameron Mackintosh
'Sir Cameron Mackintosh is the most successful, influential
and powerful producer of our time' - The New York Times |
Sir Cameron engaged RHWL Architects (his theatre specialist) to contribute to this idea. The plans provided by RHWL Architects demonstarte how the site could:
|
![]() |
![]() |
Sir Cameron Mackintosh is aware of Malta's present facilities and
believes that
|

Trevisan assures us that the total cost of project will not exceed 15million Euros.
15million Euros is approx Lm6.5million.
|
|
|---|
|
Your comment is very welcome. |
|---|